top of page
HYBRID HOUSING
Second project of the 2nd year, finishing at the start of 1st lockdown.
Based in Leeds.
Brief requirements: develop a hybrid housing scheme with a public area of a chosen use.
​
Before designing the housing scheme the challenge was to redevelop the site area by proposing a master-plan that would fit into the future proposal by Leeds City Council.
The chosen hybridity was craft workshops with the focus on jewellery making, as Leeds is a fashion oriented city.
The scheme is fully accessible with all the flats being disabled-friendly.
bottom of page